- Location
- Munich, Germany
- Project
- Bathroom refurbishment
- Completed
- 2020
- Key works
- Walk-in shower, underfloor heating, smart controls

01The brief
Strip out an existing bathroom and rebuild it with a walk-in shower, his-and-hers basins and underfloor heating, moving the water and drainage to suit the new layout.
02What we did
- Stripped the room back and relocated the water and drainage
- Re-plastered the walls
- Built a walk-in shower and fitted his-and-hers basins
- Laid porcelain tiles over electric underfloor heating
- Added smart controls
03The result
A calm, modern bathroom. Working abroad meant adapting quickly to German building methods and materials, from sourcing the products through to completion.
Start a similar projectFrom start to finish






6 / 6FinishedSeptember 2020
Real site photos from this job, in the order they were taken.
The finished project
The works completed had been done to a very high standard we couldn’t be happier we would highly recommend.
More of our work
Project consultation
Let's plan your project
We visit, measure up and talk through the project, then send a clear, itemised proposal.







