- Location
- Frensham
- Client
- Frensham Heights School
- Completed
- 2024
- Timing
- During the school holidays

01The brief
The school wanted one of its main halls to sound better, look better and cost less to light. The high-level windows had to stay clear for daylight, the ceiling had to allow for future upgrades, and the work had to be done while the school was closed.
02What we did
- Surveyed the hall and designed a suspended ceiling to suit it
- Dropped the centre of the ceiling, with vertical bulkheads around the edge to keep the high windows clear
- Fitted acoustic panels to cut the echo
- Installed modular LED lighting that is easy to maintain and upgrade
- Worked from scaffolding to the holiday timetable, then tested the acoustics and lighting
03The result
The school reported much less echo in assemblies and performances, positive feedback from staff and pupils on the new look, and energy savings from the LED lighting.
Start a similar projectFrom start to finish



3 / 3FinishedApril 2024
Real site photos from this job, in the order they were taken.
The finished project
We were blown away by the quality of the building work and service provided by the Crosbie Builders Ltd team. Nothing was too much trouble and everything was efficiently organised and completed with great courtesy.
More of our work
Project consultation
Let's plan your project
We visit, measure up and talk through the project, then send a clear, itemised proposal.





